WITH EFFECT FROM THE ACADEMIC YEAR 2013–2014

 

CS 483

 

PROJECT                                                           

Instruction                                                                                                                                                                                       6  Periods per week

Duration of University Examination                                                                                                                                                  Viva Voce

University Examination                                                                                                                                                                    Grade*

Sessional                                                                                                                                                                                        25 Marks

 

Solving a real life problem should be the focus of U.G. projects. Faculty members should propose the projects (brief scope and references) well in advance which should be made available to the students at the department library. The project could be classified as hardware, software, modeling, simulation etc. The project should involve one or many elements of techniques such as analysis, design, synthesis.

 

The department will appoint a project coordinator who will coordinate the following:

 

Grouping of students (maximum of 3 in a group) Allotment of projects and project guides

Project monitoring at regular intervals.

 

All projects allotment is to be completed by the 4th week of 4th year 1st semester so that the students get sufficient time for completion of the project.

 

All projects will be monitored at least twice in a semester through student presentations. Sessional marks are to be based on the Grades/ Marks, awarded by a monitoring committee comprising of faculty members as well as by the supervisor.

 

Efforts should be made that some of the projects are carried out in industries with the help of industry coordinators, Problems can also be invited from the industries to be worked out through U.G. projects.

 

Common norms will be established for the final documentation of the project report by the respective departments.

 

*Excellent / Very Good / Good / Satisfactory / Unsatisfactory

 

Note: Three periods of contact load will be assigned to each project guide.


Articles View Hits
13009394
   Tue, 11-Feb-2020, 09:02 PM PROJECT.
Powered by Joomla 1.7 Templates
Developed by MVSREC